Most feed mills lose 2–5% of ingredient value to untracked variance. Enter your numbers below and see the real cost — in rupees, per month.
Tonnes produced per day
Typical feed mills see 2–5% variance
Weighted average cost per tonne of finished feed
Based on 26 working days/month and 65% recoverable variance (conservative industry average). Actual results depend on your mill's specific conditions.
Enter your mill data
Fill in the form to see your estimated losses and recovery potential.
0.5–1.5%
Scale drift, manual overrides, and incorrect tare weights across batches.
0.5–2%
Substitutions without recalculating, rounding shortcuts, and stale ingredient data.
0.3–1%
Uncounted moisture changes during grinding, mixing, and storage.
0.2–0.5%
Transfer losses, floor sweepings, and equipment residuals between batches.
Weekly insights on formulation, cost optimization & compliance